机构地区: 中铁第四勘察设计院集团有限公司,武汉430063
出 处: 《铁道通信信号》 2017年第8期13-16,共4页
摘 要: 对枢纽站点布置及运输需求进行分析,指出枢纽内上、下行载频切换可能存在的问题,研究总结解决方案,提出了动车段所、枢纽大站直向及跨上、下行线转频的优化建议。 The layout and operation requirement of railway junction terminal are analyzed.It is pointed out that some problems might remain in the switching of carrier frequency for up and down train operation within a junction terminal.The solution to those problems is studied and an optimized scheme is proposed for the switching of carrier frequency for straight through train operation and cross up-down line train operation in EMU depot and large station within a junction terminal.