作 者: (王强);
机构地区: 云南工程建设总承包公司,昆明650211
出 处: 《工程建设与设计》 2017年第17期165-166,共2页
摘 要: 随着我国建筑业高速发展,超高层建筑的建设总量在不断增加。在超高层建筑的建设过程中,对于混凝土的泵送技术要求非常高。因为,超高层建筑的混凝土泵送工作需要考虑长距离、大高差、高压力的泵送过程,这就对超高层混凝土泵送技术提出了一定的挑战。为解决此类问题,论文针对超高层混凝土泵送技术进行简要分析。 With the rapid development of China’s construction industry,the total construction of super high-rise buildings are increasing,in the construction process of these high-rise buildings,for very high technical requirements of concrete pump,concrete pump for high-rise building and delivering work needs to take into account the long distance,high,high pressure pump,the super high-rise concrete pumping technology presents certain challenges,in order to solve this problem,this paper high-rise concrete pumping technology is briefly analyzed.