作 者: (江涛);
机构地区: 中国葛洲坝集团第二工程有限公司,四川成都610091
出 处: 《四川水力发电》 2017年第4期22-24,32,共4页
摘 要: 由于水工混凝土施工周期较长、结构和运行条件比较复杂,所以其在施工的过程中难免会出现一系列的问题。介绍了几种水工混凝土缺陷的防治与处理技术,可供类似工程参考和借鉴。 Hydraulic structure concrete construction period is long,structure and operation conditions are relatively complicated,so a series of problems are hard to be avoided during construction. Some prevention and treatment methods for hydraulic concrete defeats are presented in this paper to give references to the similar projects.