机构地区: 新疆大学建筑工程学院,乌鲁木齐830047
出 处: 《城市轨道交通研究》 2017年第9期54-57,共4页
摘 要: 乌鲁木齐市地铁1号线正在开工建设。为确保地铁线路附近市级历史建筑南大寺大殿本体的安全,详细分析了乌鲁木齐地铁1号线在施工期间和运营期对南大寺大殿的影响。根据南大寺大殿的安全鉴定报告,提出了具体针对性的基础加固措施;结合地铁施工的实际情况,提出了南大寺大殿的保护措施。 At present,Urumqi metro Linel is under construc- tion. To ensure the safety of the main hall of Nanda Temple -- a municipal cultural relics, the influences of metro Line 1 on the temple during the construction and the later operation periods are analyzed in detail based on field inspection of the temple hall foundation and the deformation of the hall main structure. According to the authoritative safety assessment re- port, pertinent foundation reinforcement measures are pro- posed. Finally,combined with the practical construction of metro Line 1, corresponding suggestions are given for the pro- tection of the main hall of Nanda Temple and the environment preservation during metro construction.