4-?3.0m顶管同步穿越京广铁路施工技术
Construction Techniques for 4-?3.0m Pipes to Be Jacked Synchronously to Under-Cross the Beijing-Guangzhou Railway

作  者: (王立佳);

机构地区: 中铁十八局集团第五工程有限公司,天津300450

出  处: 《国防交通工程与技术》 2017年第5期44-47,共4页

摘  要: 结合西柏坡电厂废热利用入市项目下穿京广铁路防护涵工程,介绍多孔、大直径、小间距顶管同步下穿铁路既有线施工技术,阐述了顶管下穿前的线路加固技术、大直径顶管同步穿越过程中沉降控制措施等。监测数据表明,沉降量均控制在允许范围内,保证了铁路的安全运营。 With the waste-heat-utilizing project of the Xibaipo Power Plant under-crossing the protective culvert for the Beijing- Guangzhou Railway as an illustrative example, introduced in detail in the paper are the construction techniques for multi-pipe, large-diametered and little-separating-distance pipes to be jacked simultaneously to under-cross an existing railway,with the railway-consolidating techniques before the under-crossing of the jacked pipes, the settlement-controlling techniques in the process of the large-diametered pipes simultaneously under-crossing the railway and the like dealt with. The monitored data show that the settlement is kept within the range of the permits so that the safe operation of the existing railway is fully en-sured.

关 键 词: 下穿铁路 顶管 减阻注浆 施工监测

相关作者

作者 彭汉国
作者 刘良贤
作者 黎秀云

相关机构对象

机构 广东工业大学
机构 广东工业大学土木与交通工程学院
机构 广州南洋理工职业学院
机构 广东外语外贸大学

相关领域作者

作者 庞菊香
作者 康秋实
作者 康超
作者 廖伟导
作者 廖刚