作 者: (刘辉);
机构地区: 4101811984111167216,郑州450000
出 处: 《中小企业管理与科技》 2017年第25期145-146,共2页
摘 要: 论文针对跨铁路转体桥施工阶段梁体应力及变形监测的研究,以襄阳市襄阳东站连接线改建工程跨越汉丹铁路转体桥为例,通过对其工程设计施工方案的分析,提出相应的监测方案,并针对监测结果展开论述。希望论文的研究,能为提升我国跨铁路转体桥的施工水平提供参考性建议。 Thestudyonstressanddeformationmonitoringofgirderbodyinconstructionstageofcrossrailwaytransitionbridge,papertaking the crossing HanDan railway transition bridge in Este Xiangyang Railway Station Connecting Line Reconstruction Proj ect as an example, through analyzes the construction design scheme of this proj ect,puts forward corresponding monitoring scheme,and discusses the monitoring results. It is hoped thatthe research of this paper can provide reference for improving the construction level of trans railway swivel bridge in China.