帮助 本站公告
您现在所在的位置:网站首页 > 知识中心 > 文献详情
文献详细Journal detailed

码头桩群对河道行洪与流场影响的三维数值模拟
Three dimensional numerical simulation of the effect of piled wharf on the flood passage ability of river and its flow field wharf

作  者: ; ; ; ;

机构地区: 广东省水利水电科学研究院

出  处: 《水动力学研究与进展(A辑)》 2010年第1期99-105,共7页

摘  要: 采用三维标准k-ε紊流数学模型,引入气液两相流体积率模型跟踪自由水面,对建有高桩码头的河道流场进行数值模拟,并从流速分布和水位变化两方面对数值模拟和物理模型试验结果进行对比分析,验证了数学模型的可靠性和合理性。分析结果表明:高桩码头桩群对过水断面有"束窄"作用,桩群区外的流速急剧增大;水流进入桩群区一定距离后,存在一个速度的极小区域,在桩群影响远区,其流速沿程增大;当桩群长度一定时,桩群宽度越大,其阻水作用越大;当桩群宽度一定时,桩群长度越大,其阻水越明显。 The flow field affected by tall piled wharf was simulated numerically by means of 3D standard k-ε turbulence model.The moving free surface was tracked by the fractional volume of fluid model for water-air two-phase flow.The measured results of flow field and water level validated the reliability of the numerical model and method.The analyzed results show that the water-carrying section becomes less when passed the piles group and the flow velocities become higher sharply out of the piles group.After water flow out of the piles group,there is an area of extremely small flow velocities and then the velocities will be increased along the flow direction.Under the condition that with the same length of piles group,the larger the width of piles group is,the more the blocking effect will be.Under the condition that with the same width of piles group,the more the length of piles group is,the more obviously the water level will be run up.

关 键 词: 高桩码头 数值模拟 流速 水位

领  域: [水利工程]

相关作者

作者 郑玲芳
作者 刘松华

相关机构对象

机构 华南理工大学
机构 广东金融学院
机构 广州体育学院
机构 华南理工大学建筑学院
机构 暨南大学经济学院

相关领域作者

作者 万俊毅
作者 刘小玲
作者 吴宏超
作者 莫易娴
作者 周兆钿