机构地区: 山西电力科学研究院
出 处: 《山西电力技术》 1998年第5期27-30,共4页
摘 要: 针对漳泽电厂2号炉自投产以来,一直存在主汽温度偏差的情况,尤其当2号磨单独运行时更为严重,经过对双切圆燃烧系统的分析,对三次风的燃烧调整使上述问题得以解决,大大提高锅炉运行的经济性和安全性。 The main steam temperature deviation has happened on No 2 boiler in Zhangze Power Plant ever since its commercial operation,and is getting particularly serious in case No 2 pulverizer is in operation alone.The problem was solved throgh adjusting the third forced air which is decided on the analysis of the double tengentialcircle cumbustion system.As a result it greatly improves the economic and safe operation
领 域: [动力工程及工程热物理] [电气工程]