机构地区: 中南大学土木建筑学院
出 处: 《中国地质灾害与防治学报》 2009年第2期80-86,共7页
摘 要: 通过全面的野外调查和历史资料统计分析,统计了枝柳线张家界工务段沿线的地质原生灾害、次生灾害和衍生灾害的数量,并研究了各种灾害的分布规律。针对既有线铁路的特征,选取了地质灾害的发育因子、基础因子和诱发因子作为评价指标,并且基于区域地质灾害评价预警的递进分析理论与方法(AMFP),对原有方法进行了改进和拓展,形成了既有线铁路的地质灾害"四度"法评估方法。由此,分别计算了枝柳线张家界工务段地质灾害的发育度、潜势度、危险度和危害度(简称"四度"),且据此进行了综合分区,为既有线铁路的地质灾害监测和管理提供科学依据。 Through field investigations and historical data collection, the number and distribution of original geo-hazards, secondary geo-hazards, and derived geo-hazards along the Zhangjiajie district in Zhi-Liu railway were studied. Developmental factor, basic factor, and inducing factor were selected as index of existing railway geo-hazards evaluation analysis, with a corresponding method named four degree evaluating analysis method, which was proposed by improving and developing the progressive analysis theory and method in regional geo-hazards evaluating and prewarming. The proposed method was applied to evaluate the developmental degree, potential degree, dangerous degree, and harmfulness degree of geo-hazards along the Zhangjiajie district in Zhi-Liu railway. Geo-hazards zoning was conducted according to the results of evaluation. What mentioned above could provide scientific basis for existing railway geo-hazards monitoring and governing.