帮助 本站公告
您现在所在的位置:网站首页 > 知识中心 > 文献详情
文献详细Journal detailed

建设工程项目实施阶段后评价体系与方法探讨
An Approach to the Post-evaluating System and Methods of Civil Engineering Construction Projects in Executive Period

作  者: ;

机构地区: 广东工业大学

出  处: 《基建优化》 2007年第2期9-10,共2页

摘  要: 建设工程项目实施阶段后评价的目的是为提高项目管理水平和对项目管理者进行客观公正的考核提供依据。项目实施阶段后评价的体系可按项目管理的内容和过程确定,应采用过程评价与效果评价相结合,分析评价与对比评价相结合,定性评价与定量评价相结合,业主方评价与承包方评价相结合,评价与建议相结合的方法。 The post - evaluation in executive period of civil engineering construction projects aims to promote the project management and to provide a foundation of examining the project managers fairly and objectively. The evaluating system of it could be defined by the content and the course of the project management. Methods should be taken in the evaluation that combines process evaluation and effective evaluation, analyzing evaluation and contrast evaluation, property evaluation and quantity evaluation, owner-side evaluation and contractside evaluation, evaluation and suggestion.

关 键 词: 建设工程项目 实施阶段 后评价 体系 方法

领  域: [经济管理]

相关作者

作者 郑国营
作者 石雪冬
作者 黄根生
作者 陈志盛
作者 魏新

相关机构对象

机构 华南理工大学
机构 中山大学
机构 华南农业大学
机构 广东工业大学
机构 广东工业大学建设学院

相关领域作者

作者 廖刚
作者 张为
作者 张丽丽
作者 张丽娟
作者 张丽娟