机构地区: 华南农业大学工程学院
出 处: 《农机化研究》 2007年第3期12-14,共3页
摘 要: 针对甘蔗机械化生产收获—运输系统的配置和调度问题,运用非线性规划方法建立了配置模型,运用0-1型整数规划方法建立了调度模型,通过计算机模拟,并在广东广前糖业发展有限公司进行实证研究。结果表明,在节约机具投资和减少运作成本方面取得了满意的优化效果。 To the optimization of machinery selection and scheduling for mechanized sugarcane farm in large harvesting-transportation system, a nonlinear programming model for machinery selection and a 0-1 integral programming model for machinery scheduling were developed. The Simulation decision way can have a good affection on doing the optimization of machinery selection and scheduling for mechanized sugarcane farm in harvesting - transportation system.