帮助 本站公告
您现在所在的位置:网站首页 > 知识中心 > 文献详情
文献详细Journal detailed

坝下游面钢衬钢筋混凝土管道结构优化布置
Optimization of arrangement of steel lining reinforced concrete penstocks on the downstream surface of dams

作  者: ; ; ;

机构地区: 武汉大学水利水电学院水资源与水电工程科学国家重点实验室

出  处: 《水力发电学报》 2006年第4期96-101,共6页

摘  要: 本文从管道截面形状、钢材用量和钢筋布置、钢衬外包混凝土厚度,管道与坝体相对位置及接缝处理四个方面,论述坝下游面钢衬钢筋混凝土管道结构设计的优化方法和原则。结合某水电站工程的实际,从优选的角度对该工程坝下游面钢衬钢筋混凝土管道的布置进行对比分析,表明从减小管线长度、节省工程投资的角度出发,建议采用半埋,外包1.5m厚混凝土的结构布置形式。 From the section shape of penstocks, allocation of steel and arrangement of reinforcing bar, thickness of concrete around steel pipe as well as the interface between the dam and the penstock, the optimization method and principle of structural design of steel lining reinforced concrete penstocks on the downstream surface of dams have been discussed. In accordance with the practice of Jinanqiao hydropower station, contrastive analysis on the arrangement of this kind of penstock has been carried out by means of optimization method. An arrangement of semiburied type with 1 .5in-thick concrete wall is suggested in order to reduce the length of pipe line and economize the investment of the engineering.

关 键 词: 水工结构 结构优化布置 有限单元法 背管 钢衬钢筋混凝土 钢材配置 管坝接缝面

领  域: [水利工程]

相关作者

相关机构对象

相关领域作者

作者 万俊毅
作者 刘小玲
作者 吴宏超
作者 莫易娴
作者 周兆钿