机构地区: 五邑大学
出 处: 《森林工程》 2006年第3期22-24,共3页
摘 要: 介绍江门市迎宾大桥加固改造工程的实际工作,并通过对该桥梁的荷载检测和结构验算,设计出预应力混凝土连续箱梁、普通混凝土T梁及其横隔板等加固工程的施工方案,采用粘贴钢板加固法和化学灌浆法等新工艺和新技术,对该桥进行了施工,取得了良好的工程效果。 The consolidation and reconstruction engineering of Jiangmen Yingbin Bridge is reviewed, and the consolidation schemes are designed on pre-stressed concrete continuous box girder, common concrete T type girder and diaphragm by loading measurement and checking computation for status of bridges. The methods such as plate sticking reinforcement and chemical grouting method are adopted in the construction of the bridge and have gained good effects.