机构地区: 南京大学环境学院污染控制与资源化研究国家重点实验室
出 处: 《粉煤灰综合利用》 2005年第5期15-17,共3页
摘 要: 在对长兴电厂粉煤灰系统研究的基础上,对其品质进行了综合评价;针对该厂收排灰系统的现状,制定了近期和远期两套综合利用方案,并对不同等级灰提出了相应的综合利用建议。 On the basis of systemic research on the fly ashes drained from Changxing Power Plant, their qualities have been evaluated generally. Two kinds of comprehensive utilization project, one for the near future and the other for far future, have been set down, and meantime suggestions of comprehensive utilization have been made for different grade fly ashes.
领 域: [环境科学与工程]