机构地区: 广东工业大学应用数学学院
出 处: 《广州大学学报(自然科学版)》 2005年第5期392-394,共3页
摘 要: 投资项目评估的主要标准是NPV和IRR,但两标准之间存在多方面的不自恰性.文章从理论上分析了两种决策指标评价导致结论不一致的原因,提出了新的解决方法,从而使两种方法的评价结果趋于一致. NPV and IRR are two criteria for investment opportunity. But there exists conflict between them. In this paper, the authors argue theoretically the reason why different conclusions are responded to the NPV and IRR. And furthermore, a new method is provided, with which the conflicts can actually be tackled thus the same conclusion is drawn from NPV and IRR.
领 域: [经济管理]