机构地区: 铁道第四勘察设计院
出 处: 《交通与计算机》 2005年第4期84-86,共3页
摘 要: 文章在分析铁路勘测设计现状的基础上,阐述了解决勘测设计一体化的中间环节,即站前专业间接口系统的重要性,提出了该系统的运行模式、实现方案,探讨了必须解决的技术难点,经实际运作证明该系统是可行的。 On the basis of analyzing the current status of railway survey and design, this paper elaborates the importance of solving the middle link of survey and design integration, namely, the interface system among the substructure specialty, puts forward the operation mode and the solution for this system, and discusses the key technical points that should be solved. It is feasible in practice.
领 域: [自动化与计算机技术] [自动化与计算机技术]