机构地区: 浙江大学建筑工程学院
出 处: 《低温建筑技术》 2004年第4期30-32,共3页
摘 要: 对浙江电力生产调度大楼的钢桁架转换层的整个施工过程进行了模拟 ,通过对钢桁架端部在两种约束条件下钢桁架的受力进行了详细的对比分析 ,得出了钢桁架转换层在施工过程中的一些响应规律 。 Simulation of the whole construction process of the steel truss transfer story of the Zhejing electric power building is performed.The responses of the truss under two different restraint conditions were analyzed in details.Rules for the truss response in construction can be educed.Advices are provided for the design and construction of large-span steel truss transfer story.
领 域: [建筑科学]